Case Studies & Recent Wins
Where our estimating work meaningfully changed the outcome for our clients. Client names withheld per NDA; project details abstracted to industry + market.
$38M healthcare MOB — bid won by 1.2%
GC bidding a 4-story medical office building. We caught a 3,400 SF mismatch between the structural plan and the architectural plan that the competing estimator priced as-drawn. Corrected scope shaved $640K from our client's bid.
Read full case study →Retrofitted MEP estimate in 48 hours
Distribution warehouse MEP retrofit — client lost their in-house estimator the week the bid was due. Full mechanical, electrical, plumbing estimate delivered in 48 hours from a partial drawing set. Bid submitted on time.
Read full case study →Concrete takeoff held within 0.4% of as-built
Post-tensioned parking garage. Our pre-bid concrete CY came in within 0.4% of the final delivered tonnage. Client used the variance report to negotiate change orders during construction.
Read full case study →Sponsor licence change order avoided
Higher-education science building. We flagged 17 scope ambiguities during pre-bid takeoff that the design team clarified before construction. The clarifications avoided an estimated $2.1M in change orders.
Read full case study →Get your free estimate today
Send us your plans and we'll respond within 4 business hours — no commitment.