Headquartered in Boulder, CO · Serving all 50 states | Mon-Fri 9:00 AM - 5:00 PM MT
Free quote · 4hr response Free Downloads Book Consultation
Requirements

Mechanical Estimating Services — Requirements

What information and documents Vortex Estimating needs to deliver a mechanical estimating services. Project info, drawing requirements, specifications, location, and turnaround details.

Requirements: What we need to start a mechanical estimating services

To produce an accurate mechanical estimating services, our estimating team works from a defined set of project documents and information. This page lists what we typically need at engagement time. If you’re missing items, we can often start with what you have and identify the gaps during scope review.

Information needed for MEP estimating

  • MEP drawings (mechanical, electrical, plumbing) at minimum DD-stage completeness
  • Equipment schedules with model numbers or basis-of-design specifications
  • One-line electrical diagram
  • Mechanical schedule with equipment and ductwork data
  • Plumbing fixture schedule
  • Control specifications (BACnet, LonWorks, proprietary)
  • Specifications for any specialty systems (med gas, lab gas, fire alarm, low voltage)
  • Project location and any prevailing-wage requirements

Document formats we accept

For BIM-based MEP estimates we extract directly from Revit MEP models using Autodesk Quantification or the model’s published schedules.

For projects with file sizes exceeding 25 MB, we recommend sharing via a project portal (Procore, Bluebeam Studio, Autodesk Construction Cloud, BuildingConnected, Dropbox, Google Drive). Email attachments work for smaller document sets.

What happens after you send your project

  1. Scope review within 4 business hours — A senior estimator reviews your documents, identifies any gaps, and replies with turnaround and fee. No commitment.
  2. You accept the quote — If you proceed, work begins immediately.
  3. Deliverable in 24-72 hours — Standard turnaround for most projects.
  4. Bid-day support included — Sub-hour response on clarifications during your bid submission window.

What if my project doesn’t have all of this?

We can work with partial documentation. The deliverable’s AACE class will reflect the design maturity — a Class 5 estimate from schematic drawings is fine for budget purposes; a Class 1 estimate requires complete construction documents.

When information is missing, we document the assumption explicitly so the estimate is defensible. We don’t guess at scope and we don’t pad numbers to cover unknowns — we document the unknowns instead.

Ready to send us your project?

Send your documents to [email protected] or use the contact form to upload directly. We respond within 4 business hours.

Other resources for Mechanical Estimating Services

Overview

Main service page with full description and FAQs.

Read

Software & Tools

Detailed information about software & tools for Mechanical Estimating Services.

Read

Sample Output

Detailed information about sample output for Mechanical Estimating Services.

Read

Pricing

Detailed information about pricing for Mechanical Estimating Services.

Read
Free quote · 24-72hr turnaround · No commitment

Ready to engage Vortex Estimating for Mechanical Estimating Services?

Send us your project documents and we'll respond with a quote in 4 business hours.

NDA-friendly
4hr response
±2% accuracy
150+ projects
Call Get a Quote